Products & Services

Refining Plant 15kg

 
Working Principle

The system for a correct dust laying is made by a special scrubber tower where the noxious vapours are channelled into a tower with their consequential speed reduction. From the dome tower, a drainage system homogeneously spread a neutraliser agent specific for each kind of vapour.

  • Refinery is a procedure used to extract pure metal from an alloy. This is an ancient process,but still used for its simple operation, cheap, too!
  • By our compact refining plants, it is possible to achieve a purity of the treated metal close to 99,99%.
  • With our plants the purity obtained is very high, never less than 99,95%.
  • Refinery is made by the dissolution of the entire alloy mass into Aqua Regia by the pure gold precipitat ion in powder form to be consequently washed.
  • With this process it is possible to recover the silver as insoluble silver chloride. Then, by the right procedure, it will be possible to reduce the metallic silver.
  • Thanks to the right vapour speed modulation and to the intensity of the reactor drainage, the scrubber neutralise the fumes until the 99%.
  • With our systems is possible to normalise and optimise the concentration of the agent by the PH-metre and a dosing pump.

Refinery (Refining Plant 15kg) Big Silver Refining plant ORS EAg3
Big Gold Refining PlantBig Silver Refining Plant

Technical Features

  • The installation is complete of: Tower sizes: Height mm 3500, Diameter mm 600
  • Bed of Rashing rings made in PP
  • Sprinkled by sprayers made in PVC
  • Recycling pump with impeller and dipping part made in PP
  • Drops separator
  • Well dimensioned aspirator in PVC which has PP impeller on the tower outlet;
  • Piping in PVC
  • Tank for solution holding, equipped of vertical pump made in PP for liquid recycling
  • Inspection window for rings charge and discharge
  • Automatic dosing pump
  • pH-meter to control the purity of the rinsing water
  • Capacity: 1500 m3/h
  • Overall dimensions : 700 x 1500  x 3500h mm

Small Gold Refining Plants

Small Gold Refining Plants

Example Models
ORS TR8
ORS 50/100
ORS 100/200
ORS 100D/200
ORS 200D/200
Average of refined alloy per normal working shift
over
12 Kg.
over
30 Kg.
over
60 Kg.
over
120 Kg.
over
240 kg.
Numbers of working glass reactors
02
02
02
03
03
Heating system:
Electric
Diathermy
oil bath
Diathermy
oil bath
Diathermy
oil bath
Diathermy
oil bath
Power consumption
Kw 3,5
Kw 5,0
Kw 7,5
Kw 13,0
Kw 15,0
Overall size
160x130x220H cm.
360x150x240H cm.
360x150x240H cm.
520x150x240H cm.
520x150x240H cm.

Small Silver Refining Plants

Small Silver Refining Plants

Example Models
ORS PEAG12
ORS EAG1
ORS EAG2
ORS EAG3
ORS EAG5
Refined alloy per day
till 12 Kg.
over 30 Kg.
over 60 Kg.
over 90 Kg.
over 150 kg.
Numbers of working cells
01
01
02
03
05
Movement system:
Compressed air
Compressed air
Compressed air
Compressed air
Compressed air
Up gradable
NO
YES till 150 Kg.
YES till 150 Kg.
YES till 150 Kg.
NO
Overall size
150x80x160H cm.
200x95x130H cm.
300x95x130H cm.
400x95x130H cm.
600x95x130H cm.

Gold Potassium Cyanide Production Plants

Gold Potassium Cyanide Production Plants

Example Models
Production capacity per day
Working cells
Heating system
Over all dimensions
ORS CyAu3
around 03 Kg.
30 liters glass
Static heater
240x85x246H cm.
ORS CyAu5
around 05 Kg.
50 liters glass
Static heater
240x85x246H cm.

Electrolytic Gold Refining Plant

Working Principle

Electrolysis is a technological process that utilizes the electric energy generated from a current rectifier and from the technical features of acid solution. The metal to be deposited (in this case Au) is melted by a liquid solution called gold chloride. The metal to be refined is generally composed of almost pure gold (min. 995,0‰), previously melted and poured in a special mould called ANODE which will be placed to the positive pole.

Electrolytic System
 

The cathode, a very thin plate of pure gold (999,9‰) will be placed to the negative pole. By means of a proper electromotive force and for the electrolytic bath characteristics , the metal anodes will gradually dissolve; at the same time, through the natural pole attraction between electrodes, gold migrates towards the cathode under metallic sponge form, in the plunged cathode surface.

 

Once the operation is over, the initial cathode and the total gold sponge deposited , are properly washed , melted and prepared for the following working phases. Being a selective process for noble metals, when the operation ends, the cathode will carry only an elevated fineness gold deposit: 999,9‰.ALWAYS GUARANTEE. Productivity is to be considered in 24 h. cycle and taking into consideration the number of anodes used in the cells, following from the morning these operations:

Electrolytic System
Electrolytic System
  • Cathodes recovery / washing and melting
  • Recovery of anodes pieces / washing
  • Melting of new anodes
  • Bath maintenance (acidity and gold analysis)
  • Bath filtering / parameter correction
  • New cathodes positioning / pre-heating
  • New anodes positioning
  • Initial current setting
  • Gradual current increasing up to proper parameter achievement
  • Control of baths and adding systems levels

Model: ORS Eau20

  • Refined capacity: per day over 20 Kg.
  • Working cells: 02
  • Heating system: PTFE wire
  • Power consumption Kw: 4,5

Model: ORS Eau30
  • Refined capacity: per day over 30 Kg.
  • Working cells: 01
  • Heating system: PTFE wire
  • Power consumption Kw: 5,0
Latest Events

No Latest Events

archive events

Latest News
Stay connected with us
Facebook
Youtube
Twitter
Change your preferred Language:
Home | Contact Us | Feedback | Disclaimer
Copyright © 2010 Delmer Products Ltd. All Rights Reserved.
Certificat
Celebrating 24
OIML